{"id":6675,"date":"2021-10-29T12:38:39","date_gmt":"2021-10-29T10:38:39","guid":{"rendered":"https:\/\/cobarspa.it\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/"},"modified":"2022-03-30T11:36:52","modified_gmt":"2022-03-30T09:36:52","slug":"lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2","status":"publish","type":"opera","link":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/","title":{"rendered":"GIOIA TAURO SEAPORT- Gioia Tauro (RC)"},"content":{"rendered":"\n<p>The intervention, devised for the completion and development of the northern sector of the Gioia Tauro Seaport, aims at upgrading the road system thanks to new road axes, totalling &nbsp;an overall development of about 3.100 m:<\/p>\n\n\n\n<p>&#8211; axis A, with a double-lane roadway, as a bypass to the S. Ferdinando junction railway track;<\/p>\n\n\n\n<p>&#8211; axes B and C, single-lane, to resume the MCT connection;<\/p>\n\n\n\n<p>&#8211; axes D and E, with their two lanes branching off from a roundabout intersection to be built at the end of axis A, and allowing connections to the former Isotta Fraschini plant area and the former ENEL area.<\/p>\n\n\n\n<p>To complete the operations planned for the main axis, a new configuration of the railway shunting rod has been added in the southeast ern area of the MCT aprons. Moreover, the Port Authority also intends to improve the so-called &#8220;backdock&#8221; traffic circulation, which develops along the wave barrier protecting the inner basin of the Port. This is an intervention of totalling a development of about 3.000m, divided into three sections measuring 195m respectively: a 1.200m long connection to the existing traffic segment in which the longitudinal profile is to be brought to compliance standards; an intermediate section that borders the wave barrier wall, for which flexible paving (binder + wearing course) is planned to be laid on the underlying existing concrete layer, and also includes three rods of connection with the existing road network(facing the internal basin) for a total development of about 400m; a final stretchof about 1.600m where it is estimated that the recently built flooring will only require the paving of the wearing course.<\/p>\n\n\n\n<p>Finally, in order to connect two different functional areas (loading\/unloading yard and workshops), the built railway road system consists of a total of 830m of development site, 700m of which follow an obsolete railway section, with the creation of a mixed-use roadway and a 130m green area within the port.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The intervention, devised for the completion and development of the northern sector of the Gioia Tauro Seaport, aims at upgrading the road system thanks to new road axes, totalling &nbsp;an overall development of about 3.100 m: &#8211; axis A, with a double-lane roadway, as a bypass to the S. Ferdinando junction railway track; &#8211; axes [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":679,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[18],"class_list":["post-6675","opera","type-opera","status-publish","has-post-thumbnail","hentry","category-infrastructure"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.2 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>GIOIA TAURO SEAPORT- Gioia Tauro (RC) - Cobar<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GIOIA TAURO SEAPORT- Gioia Tauro (RC)\" \/>\n<meta property=\"og:description\" content=\"The intervention, devised for the completion and development of the northern sector of the Gioia Tauro Seaport, aims at upgrading the road system thanks to new road axes, totalling &nbsp;an overall development of about 3.100 m: &#8211; axis A, with a double-lane roadway, as a bypass to the S. Ferdinando junction railway track; &#8211; axes [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Cobar\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Cobar-Spa-126920242042031\" \/>\n<meta property=\"article:modified_time\" content=\"2022-03-30T09:36:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cobarspa.it\/wp-content\/uploads\/2021\/10\/TOP-15.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/\",\"url\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/\",\"name\":\"GIOIA TAURO SEAPORT- Gioia Tauro (RC) - Cobar\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cobarspa.it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cobarspa.it\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/TOP-15.jpg\",\"datePublished\":\"2021-10-29T10:38:39+00:00\",\"dateModified\":\"2022-03-30T09:36:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cobarspa.it\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/TOP-15.jpg\",\"contentUrl\":\"https:\\\/\\\/cobarspa.it\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/TOP-15.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/opere\\\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cobarspa.it\\\/en\\\/homepage\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Opere\",\"item\":\"https:\\\/\\\/cobarspa.it\\\/opere\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"GIOIA TAURO SEAPORT- Gioia Tauro (RC)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cobarspa.it\\\/#website\",\"url\":\"https:\\\/\\\/cobarspa.it\\\/\",\"name\":\"Cobar\",\"description\":\"Un nuovo sito targato WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cobarspa.it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"GIOIA TAURO SEAPORT- Gioia Tauro (RC) - Cobar","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/","og_locale":"en_US","og_type":"article","og_title":"GIOIA TAURO SEAPORT- Gioia Tauro (RC)","og_description":"The intervention, devised for the completion and development of the northern sector of the Gioia Tauro Seaport, aims at upgrading the road system thanks to new road axes, totalling &nbsp;an overall development of about 3.100 m: &#8211; axis A, with a double-lane roadway, as a bypass to the S. Ferdinando junction railway track; &#8211; axes [&hellip;]","og_url":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/","og_site_name":"Cobar","article_publisher":"https:\/\/www.facebook.com\/Cobar-Spa-126920242042031","article_modified_time":"2022-03-30T09:36:52+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/cobarspa.it\/wp-content\/uploads\/2021\/10\/TOP-15.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/","url":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/","name":"GIOIA TAURO SEAPORT- Gioia Tauro (RC) - Cobar","isPartOf":{"@id":"https:\/\/cobarspa.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/#primaryimage"},"image":{"@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/#primaryimage"},"thumbnailUrl":"https:\/\/cobarspa.it\/wp-content\/uploads\/2021\/10\/TOP-15.jpg","datePublished":"2021-10-29T10:38:39+00:00","dateModified":"2022-03-30T09:36:52+00:00","breadcrumb":{"@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/#primaryimage","url":"https:\/\/cobarspa.it\/wp-content\/uploads\/2021\/10\/TOP-15.jpg","contentUrl":"https:\/\/cobarspa.it\/wp-content\/uploads\/2021\/10\/TOP-15.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/cobarspa.it\/en\/opere\/lavori-di-completamento-e-sviluppo-del-comparto-nord-viabilita-del-porto-di-gioia-tauro-gioia-tauro-rc-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cobarspa.it\/en\/homepage\/"},{"@type":"ListItem","position":2,"name":"Opere","item":"https:\/\/cobarspa.it\/opere\/"},{"@type":"ListItem","position":3,"name":"GIOIA TAURO SEAPORT- Gioia Tauro (RC)"}]},{"@type":"WebSite","@id":"https:\/\/cobarspa.it\/#website","url":"https:\/\/cobarspa.it\/","name":"Cobar","description":"Un nuovo sito targato WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cobarspa.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/opera\/6675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/opera"}],"about":[{"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/types\/opera"}],"author":[{"embeddable":true,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/comments?post=6675"}],"version-history":[{"count":10,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/opera\/6675\/revisions"}],"predecessor-version":[{"id":6721,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/opera\/6675\/revisions\/6721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/media\/679"}],"wp:attachment":[{"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/media?parent=6675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cobarspa.it\/en\/wp-json\/wp\/v2\/categories?post=6675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}