Restoration and Renovation
MUSEUM OF THE HISTORY OF SCIENCE – Florence
*temp*
1
*temp*
4
3
7
6
5
*temp*
*temp*
1
2
3
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
6
7
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
11
12
previous arrow
next arrow
*temp*
1
*temp*
4
3
7
6
5
*temp*
*temp*
1
2
3
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
6
7
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
11
12
previous arrow
next arrow
SITE MANAGER

Ing. Leonardo PAOLINI

IMPLEMENTING AGENCY

ISTITUTO E MUSEO DI STORIA DELLA SCIENZA, Piazza dei Giudici - Firenze

PROJECT DESCRIPTION

Structural and functional adaptation interventions for floors I and II of the Museum of the history of Science

HEAD PROJECT MANAGER

Prof. Paolo GALLUZZI

PROJECT

-

PROJECT DURATION

15/04/2008 - 21/01/2010

TOTAL COST

€ 1.853.269,00

PROJECT SPECIFICATIONS

The works carried out by Cobar at the Museum of the history of Science have upgraded the existing spaces in their entirety, with solutions that have affected both the functional distribution and the engineering aspect. The architectural works focused on the first and second level of the Factory, in order to improve the use of exhibition spaces and museum routes. We proceeded by eliminating some internal partitions and reconfiguring the connection hallways between different areas, that we remodelled to obtain vertical uniformity from a perspective and safety standpoint, ensuring more suitable and safer paths for visitors

Moreover, in order to improve on the daily fruition of the exhibition spaces and create a clearer visitor path,

[...]Read More

The works carried out by Cobar at the Museum of the history of Science have upgraded the existing spaces in their entirety, with solutions that have affected both the functional distribution and the engineering aspect. The architectural works focused on the first and second level of the Factory, in order to improve the use of exhibition spaces and museum routes. We proceeded by eliminating some internal partitions and reconfiguring the connection hallways between different areas, that we remodelled to obtain vertical uniformity from a perspective and safety standpoint, ensuring more suitable and safer paths for visitors

Moreover, in order to improve on the daily fruition of the exhibition spaces and create a clearer visitor path, a central ring has been built, inside of which all secondary environments (such as dressing rooms, control rooms and warehouses for non-exhibited objects) have been set. This operation has also allowed for the creation of a new stone flooring (that replaced the existing one), the maintenance of the wooden ceiling and the existing wooden frames, as well as the painting of the rooms.

From an engineering standpoint, great importance has been given to the air treatment systems: this was a crucial choice to regulate the changing conditions to the internal microclimate due to the presence of visitors. This sparked the creation of a hydraulic system that provides heating and cooling to the fan coils with, in addition to a system of radiating floor panels and primary environment air for hygrometric control. These systems are located in the central section, inside ceilings that are custom- made to hide the components related to the museum’s security (smoke detectors, CCTV cameras, emergency lighting) and those related to lighting and multimedia capabilities.

Read Less

RELATED NEWS

4 May 2023

Cobar al Salone Internazionale del Restauro di Ferrara

Dal 10 al 12 maggio saremo presenti con un nostro stand espositivo al Salone Internazionale del Restauro di Ferrara.

Anche quest’anno parteciperemo ad una manifestazione unica, un luogo d’incontro per aziende, istituzioni, ricercatori e appassionati del mondo del settore del restauro. Il successo di questi eventi contribuisce all’evoluzione del nostro lavoro e alla valorizzazione del patrimonio storico e culturale dell’Italia e siamo fieri di poter contribuire al suo successo, mostrando i risultati del nostro lavoro.