SITE MANAGER

-

IMPLEMENTING AGENCY

AZIENDA OSPEDALIERA UNIVERSITARIA CONSORZIALE POLICLINICO DI BARI

PROJECT DESCRIPTION

Extraordinary maintenance for the transfer of the Psychiatry ward to the Ex Pavilion of Pneumology at the Policlinico di Bari

HEAD PROJECT MANAGER

-

PROJECT

-

PROJECT DURATION

01/12/2014 - 06/07/2016

TOTAL COST

€ 757.699,29

PROJECT SPECIFICATIONS

The intervention is geared towards the repurposing of the pneumology ward, inside the “Azienda Ospedaliera Policlinico-Consorziale” complex in Bari, to accommodate the new psychiatric ward. The repurposing intervention, from a functional and legal standpoint, focuses on the mezzanine and the second floor, while optimising the structure for the use of staff and patients. The choice […]

[...]Read More

The intervention is geared towards the repurposing of the pneumology ward, inside the “Azienda Ospedaliera Policlinico-Consorziale” complex in Bari, to accommodate the new psychiatric ward. The repurposing intervention, from a functional and legal standpoint, focuses on the mezzanine and the second floor, while optimising the structure for the use of staff and patients. The choice of top-of-the-line construction materials and insulation ensures durability over time and optimal conditions in terms of hygiene and cleanliness in the building.