Restoration and Renovation
MARGHERITA THEATRE – Bari
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 9
Thumbnail 10
Thumbnail 10
Thumbnail 10
Thumbnail 10
Thumbnail 8
previous arrow
next arrow
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 9
Thumbnail 10
Thumbnail 10
Thumbnail 10
Thumbnail 10
Thumbnail 8
previous arrow
next arrow
SITE MANAGER

Arch. Emilia PELLEGRINO Soprintendenza per i Beni Architettonici e Paesaggistici per le Province di Bari e Foggia

IMPLEMENTING AGENCY

MINISTERO PER I BENI E LE ATTIVITÁ CULTURALI Soprintendenza per i Beni Architettonici e Paesaggistici per le Province di Bari e Foggia

PROJECT DESCRIPTION

Architectural and structural restoration of the Margherita Theater in Bari

HEAD PROJECT MANAGER

Arch. Marcello BENEDETTELLI Soprintendenza per i Beni Architettonici e Paesaggistici per le Province di Bari e Foggia

PROJECT

-

PROJECT DURATION

11.07.2007 - 15.02.2010

TOTAL COST

€ 2.071.871,24

PROJECT SPECIFICATIONS

The second lot of the architectural restoration project for the Margherita Theatre in Bari brings to completion the structural interventions, the restoration of all the artistic features, including the decorative elements and fixtures, the decorative apparatus of the foyer, and the painted ceiling in the second floor room of the south wing.

Specifically, the structural works carried out by Cobar focused on the extradossal consolidation of the foyer dome with carbon fiber bands, the subsequent restoration of the structural stratigraphic layer and copper plates covering apparatus.

Additional work was provided for: the intradossal consolidation of steel structures and foyer attic joists;

[...]Read More

The second lot of the architectural restoration project for the Margherita Theatre in Bari brings to completion the structural interventions, the restoration of all the artistic features, including the decorative elements and fixtures, the decorative apparatus of the foyer, and the painted ceiling in the second floor room of the south wing.

Specifically, the structural works carried out by Cobar focused on the extradossal consolidation of the foyer dome with carbon fiber bands, the subsequent restoration of the structural stratigraphic layer and copper plates covering apparatus.

Additional work was provided for: the intradossal consolidation of steel structures and foyer attic joists; the consolidation of reinforced concrete pillars in the main entrance and on the overhanging beam; the creation of first level beams and ceilings aligned with the main entrance and with the connection corridor between the walkway and the tech rooms in the south-west corner; the creation of the small dome on the hall roof with steel structures and wooden finishes covered in copper sheets.

Particular attention was paid to the restoration of the artistic features, strongly affected by wear and tear, in order to restore the theatre’s architectural style and poise.

Finally, with the recalibration and completion of conservation interventions for wall paintings and the foyer’s stuccoes, an important piece of history of the city of Bari has been reclaimed: the original colour has been restored through chemical and mechanical cleaning operations, the gaps and missing sections have been treated with pigments that reduce visual imbalances.

Read Less

RELATED NEWS

4 May 2023

Cobar al Salone Internazionale del Restauro di Ferrara

Dal 10 al 12 maggio saremo presenti con un nostro stand espositivo al Salone Internazionale del Restauro di Ferrara.

Anche quest’anno parteciperemo ad una manifestazione unica, un luogo d’incontro per aziende, istituzioni, ricercatori e appassionati del mondo del settore del restauro. Il successo di questi eventi contribuisce all’evoluzione del nostro lavoro e alla valorizzazione del patrimonio storico e culturale dell’Italia e siamo fieri di poter contribuire al suo successo, mostrando i risultati del nostro lavoro.