Restoration and Renovation
SS ANNUNZIATA MONUMENT COMPLEX – Sassari
335x23prospetto2_1984x1304
6solaio1_2554x1678
535x23prospetto4_2554x1678
235x23prospetto1_2554x1678
135x23copertura_2554x1678
7solaio2_2554x1678
8solaio3_2554x1678
10cortile_2554x1678
9salone_2514x1652
DSC_2271_1699x2554
70x46coperture_2554x1678
60x40internostanza_1702x2554
IMG-20210128-WA0011
IMG-20210128-WA0024
IMG-20210128-WA0029
IMG-20210128-WA0046
IMG-20210128-WA0039
IMG-20210128-WA0109
previous arrow
next arrow
335x23prospetto2_1984x1304
6solaio1_2554x1678
535x23prospetto4_2554x1678
235x23prospetto1_2554x1678
135x23copertura_2554x1678
7solaio2_2554x1678
8solaio3_2554x1678
10cortile_2554x1678
9salone_2514x1652
DSC_2271_1699x2554
70x46coperture_2554x1678
60x40internostanza_1702x2554
IMG-20210128-WA0011
IMG-20210128-WA0024
IMG-20210128-WA0029
IMG-20210128-WA0046
IMG-20210128-WA0039
IMG-20210128-WA0109
previous arrow
next arrow
SITE MANAGER

Arch. Igino Fantini

IMPLEMENTING AGENCY

Ministero per i Beni e le Attività Culturali – Dipartimento per i Beni Archivistici e Librari

PROJECT DESCRIPTION

Restoration and redevelopment works of the monumental complex SS Annunziata di Sassari hosting the State Archives, University Library and ASL offices

HEAD PROJECT MANAGER

Arch. Gianluca Zini

PROJECT

Prof. Arch. Lucio Morrica

PROJECT DURATION

I stralcio 11/07/2007 – 18/06/12
II stralcio 30/05/2012 – 28/04/2017

TOTAL COST

I stralcio € 12.404.935,88
II stralcio € 11.764.417,77

PROJECT SPECIFICATIONS

The restoration works that have redeveloped the SS Annunziata complex in Sassari have returned a symbolic monument to the city and its people. Built between 1843 and 1848, to provide service and relief to the population, the former hospital now houses the university library, the State Archives and some offices of the ASL [medical and […]

[...]Read More

The restoration works that have redeveloped the SS Annunziata complex in Sassari have returned a symbolic monument to the city and its people. Built between 1843 and 1848, to provide service and relief to the population, the former hospital now houses the university library, the State Archives and some offices of the ASL [medical and healthcare authority].

The intervention has consolidated and adapted the spaces to regulation standards, allowing for different uses and functions.

In the semicircular atrium, accessible from the entrance, an information point and a cafeteria with independent accesses, servicing all three entities, have been set up.

To allow the complex’s optimal functioning, in compliance with regulations, it was deemed necessary to integrate the existing vertical connections with two staircases built in the headers of the inclined structures. Moreover, since mechanical vertical connections were not sufficient in servicing such a large environment, the internal corners of the court also feature two glass structures that allow the installation of four elevators and two freight hoists, destined separately to the three entities.

Particular care has been given to the recovery of greenery areas, that have been pruned and trimmed, in order to preserve valuable herbs and essences planted alongside other local species.

Anti-seismic measures were also implemented in the strengthening of vaults, walls and arches. In the areas where recovery was not possible, the floors, the platforms and the roof’s wooden frame have been rebuilt.

The following step was the restoration and integration of the chapel’s wall paintings, damaged by water ingress.

The wooden canopy and the columns were completely restored. All the sculptures made of wooden material, damaged by xylophagous insects, were cleaned, disinfested and strengthened. Additionally, all missing sections were integrated and their chrome tone was restored.

Restoration works were also carried out on the large windows of the main door, and on all door and window frames: cleaning and replacement of the glass, integration of the gaps in the wall painting and repainting of the wooden structure.

As for the service systems, taking into account that the large complex hosts three different entities, it was necessary to separate the system management of the Archives and the Library from the ASL offices. The systems’ strategic arrangements were guided by energy saving and efficiency principles, functional flexibility and cost limitation.