Restoration and Renovation
CITTERIO PALACE – Milan
13
CITTERIOPROSPETTOTOP
1
2
3
5
8
6
7
10
11
12
previous arrow
next arrow
13
CITTERIOPROSPETTOTOP
1
2
3
5
8
6
7
10
11
12
previous arrow
next arrow
SITE MANAGER

Ing. Francesco CALDANI Provveditorato OO.PP. Piemonte Valle d'Aosta e Liguria

IMPLEMENTING AGENCY

MINISTERO DEI BENI E DELLE ATTIVITÁ CULTURALI E DEL TURISMO Segretariato Regionale del MiBACT per la Lombardia

PROJECT DESCRIPTION

Restoration, conservation and re-functionalization of the Citterio Palace complex

HEAD PROJECT MANAGER

Arch. Paolo SAVIO Segretario per i Beni Culturali e Paesaggistici della Lombardia

PROJECT

-

PROJECT DURATION

07/05/2015 - 31/01/2018

TOTAL COST

€ 9.362.035,45

PROJECT SPECIFICATIONS

The complex, articulated in “segments” that are not always “coherent” with each other, is made up of the 18th-century main central block (including the courtyard), the rooms located on the basement and ground floor (designed by architects Ortelli and Sianesi, and recognisable by their coffered concrete ceilings), the shed-covered exhibition rooms on the second floor, the underground structure designed by James Stirling, the garden and the grotto. All different reworking operations undergone over the years will coexist with the essential functions of a modern museum. The main purpose of the restoration project was the “construction” of a system that would make for homogeneous and seamless spaces,

[...]Read More

The complex, articulated in “segments” that are not always “coherent” with each other, is made up of the 18th-century main central block (including the courtyard), the rooms located on the basement and ground floor (designed by architects Ortelli and Sianesi, and recognisable by their coffered concrete ceilings), the shed-covered exhibition rooms on the second floor, the underground structure designed by James Stirling, the garden and the grotto. All different reworking operations undergone over the years will coexist with the essential functions of a modern museum. The main purpose of the restoration project was the “construction” of a system that would make for homogeneous and seamless spaces, although different.

Therefore, horizontal and vertical paths (both mechanical and non-mechanical) have been put in place to seamlessly connect the different sections of the complex, allowing for easy access to disabled people. Specifically, as the focal point of the intervention, the great monumental staircase body was created and  equipped with two panoramic elevators; for the first time, an elevator system that connected all levels, that is the three above ground and the four underground, was created.

All spaces have been made usable, including those that have never been used before (for example, the underground spaces of the Stirling wing), and the entire complex has been equipped with the latest technologies, in line with modern museum standards.

A role of no less importance was played by the artistic restoration of the rooms on the main floor, with vaults and decorated walls as well as all the external façades. At the final stage, we proceeded with the restoration and re-adaptation of outdoor spaces such as the garden, in which the ancient lemon house and the cave have been restored, along with the reconstruction of the Poliaghi greenhouse, in order to also similarly use and integrate the elements in the surrounding environment.

Read Less

RELATED NEWS

4 May 2023

Cobar al Salone Internazionale del Restauro di Ferrara

Dal 10 al 12 maggio saremo presenti con un nostro stand espositivo al Salone Internazionale del Restauro di Ferrara.

Anche quest’anno parteciperemo ad una manifestazione unica, un luogo d’incontro per aziende, istituzioni, ricercatori e appassionati del mondo del settore del restauro. Il successo di questi eventi contribuisce all’evoluzione del nostro lavoro e alla valorizzazione del patrimonio storico e culturale dell’Italia e siamo fieri di poter contribuire al suo successo, mostrando i risultati del nostro lavoro.